xpres.DESIGN

March 20, 2016

I am currently enhancing my capability in this area to expertly and rapidly replace your old fiberglass shower unit or outdated tile installation. I have build a lot of bathrooms over the last few years and really enjoyed this aspect of those projects.

The biggest issue customers have with bathroom renovation (actually all renovations) is the time it takes from start to finish. The project element most completely on the critical path in a bathroom renovation is the shower and tile. All the finish work needs to meet it, the plumber needs to have some or all of it installed in order to install the shower valve and set the temperature for final inspection, the tile floor+walls can’t go in until the base is set , the granite curb can’t be measured, fabricated, and set until the shower is done, and the glass panels and shower door can’t be measured and fabricated until it is all grouted. There are a lot of people waiting for that shower to be done.  I am committed to examining every aspect of this task and optimizing for quality, time, and delivery.

In short, if I can design the shower, fabricate it off site, and install it in 3 days it adds the most value in terms of time and craftsmanship right at the most important place in your project plan.

So, I have decided to do just that.

Fullscreen capture 3202016 54418 PM.bmp

 

 

 

You and I design it. I build it. I bring it to your project location and install it.  Thats it.

I am actively working on making this a reality.  More as it happens

Dave

Leave a Reply

Your email address will not be published. Required fields are marked *